日韩AV无码一专区_欧洲乱码伦视频免费国产_国产一国产最新一级毛片_久久人人97色精品

DC engineering
±500kV Yihua Line anti-dancing renovation project

宜華線.jpg

The ±500kV Yihua HVDC transmission line starts from Yidu Converter Station in Yichang, Hubei province, and ends at Huaxin Converter Station in Shanghai. The total length of the line is 1,075 km, and the transmission capacity is 300 MW, which is the main artery of the three Gorges Project.

電 話
產(chǎn) 品
短 信
聯(lián) 系